Laying the First Course of Blocks
1:45
25:45
4.9M views
At 1:45 in
Crazy Neighbor Loses it & Calls the building Inspector 5 times!
What happens here
The first course of retaining wall blocks is carefully placed on the freshly compacted gravel base. Each block is checked with a level (spirit level or laser level) to ensure it is perfectly horizontal and aligned with the string line. Adjustments are made by tapping the blocks with a rubber mallet or adding/removing small amounts of gravel underneath. This foundational course is critical for the overall stability and appearance of the entire wall.
Goal: The initial layer of retaining wall blocks is meticulously laid on the compacted gravel base, ensuring they are perfectly level and properly aligned.
Tools and materials
- Level
- Retaining Wall Blocks
- Rubber Mallet
- Shovel
- String Line
What they say
(80 characters)Hide
What they say
(80 characters)Auto-generated from the video audio.