Skip to main content

Base Material and Compaction

1:39
25:45
4.9M views

At 1:39 in

Crazy Neighbor Loses it & Calls the building Inspector 5 times!

What happens here

Gravel (Class 5 is recommended for good drainage and compaction) is added to the excavated trench to create a level and stable base for the retaining wall blocks. A plate compactor is then used to thoroughly compact this gravel layer. Compaction is crucial to prevent settling of the wall over time, which can lead to structural failure. The levelness of the compacted base is continuously checked to ensure the first course of blocks will be perfectly aligned.

Goal: A layer of compacted gravel is laid as the foundation for the retaining wall blocks, ensuring a stable and well-drained base.

Tools and materials

  • Gravel (Class 5)
  • Level
  • Plate Compactor
  • Shovels and Rakes

What they say

Hide

on this job site as you watch this video you'll see that at no time do we ever drive one of our pieces of equipment onto the neighbor's property to do any of the demolition even though that would have made our life a lot easier [Music]

Auto-generated from the video audio.