Final Block Setback and String Line Alignment
10:29
25:06
3.1M views
At 10:29 in
Crazy Neighbor Calls the Building Inspector on us
What happens here
After the pins are installed, ensure all blocks are fully engaged by kicking them forward until they are pushed as far back as they will go, creating a uniform setback across the course. Then, stretch a string line along the entire length of the course. This string line acts as a visual guide to ensure all blocks are perfectly aligned, resembling 'soldiers in a row', which is essential for both the structural integrity and the aesthetic appearance of the retaining wall.
Goal: Properly set back the blocks for consistent alignment and verify the course's straightness with a string line.
Tools and materials
- Retaining Wall Blocks — The components being aligned and set back
- String Line — Ensuring horizontal alignment of the block courses