Compact Base Material
7:06
25:06
3.1M views
At 7:06 in
Crazy Neighbor Calls the Building Inspector on us
What happens here
After the initial base material (washed rock) is spread behind the first course of blocks, it needs to be thoroughly compacted. Use a 150lb plate compactor to achieve maximum density. The compactor should be moved systematically over the entire area of the rock fill to ensure uniform compaction. This step is critical for preventing future settling and maintaining the structural integrity of the retaining wall.
Goal: Compact the base material to ensure a stable and dense foundation for the retaining wall.
Tools and materials
- 150lb Plate Compactor Wacker Neuson — Compacting the washed rock/gravel base
- Washed Rock/Gravel — The material being compacted
What they say
(633 characters)Hide
What they say
(633 characters)Auto-generated from the video audio.