Final Slope Grading, Fabric, and Drainage Install
At 25:01 in
Conquering another sketchy hill.
What happens here
With the ramp in place, the skid-steer begins to push and spread the delivered fill soil across the slope, rough-grading the area where the retaining wall will be constructed. The excavator assists in deeper excavation and initial shaping of the terrain. The crew then uses hand tools like shovels and rakes to perform fine grading, ensuring the slope has the desired contours. Geotextile fabric is laid down as a base layer for the retaining wall, followed by the installation of drain tile to manage water runoff and prevent hydrostatic pressure behind the wall.
Goal: The slope is rough-graded with heavy machinery, fine-graded by hand, and prepared with geotextile fabric and drain tile for the retaining wall.
Tools and materials
- Excavator
- Rakes
- Shovels
- Skid-Steer Loader
- Vibratory Plate Compactor
- Drain Tile
- Geotextile Fabric