What happens here
Once the weed barrier is installed, begin filling each stair section with 3/8 aggregate. The video shows the aggregate being transported in a wheelbarrow and then dumped into the stair treads. Use a shovel and potentially a brush or rake to evenly distribute the aggregate across the entire surface of each step, ensuring that it fills the space completely and is level with the top of the wooden risers. This forms the bulk of the footing material.
Goal: Create a base layer for the footings using aggregate material