Skip to main content

Fill Steps with Aggregate

0:46
1:25
105.1K views

At 0:46 in

Building Outdoor steps (PT 2)

What happens here

Once the weed barrier is installed, begin filling each stair section with 3/8 aggregate. The video shows the aggregate being transported in a wheelbarrow and then dumped into the stair treads. Use a shovel and potentially a brush or rake to evenly distribute the aggregate across the entire surface of each step, ensuring that it fills the space completely and is level with the top of the wooden risers. This forms the bulk of the footing material.

Goal: Create a base layer for the footings using aggregate material

Tools and materials

  • 3/8 Aggregate
  • Brush/Rake
  • Shovel
  • Wheelbarrow

What they say

Hide

guy? 38 aggregate. This is going to be a lot of rock. What can I say? I'm a real rock guy. If you're looking to shed 15 to 20 pounds by summer, look no further. Simply call 1800. My back hurts. I'm going to have two Gatorades, too. I deserved it. I've been a good boy with this. I know the sugar, but who it? I'm going to do it. Told you I was going to do it. Staying on business. I actually don't know what that means. By watering the aggregate, then

Auto-generated from the video audio.