Site Preparation and Leveling
2:19
18:44
342.1K views
At 2:19 in
Building Backyard WATERFALL FEATURE
What happens here
Begin by clearing the designated area for the water feature. This involves removing any existing plants, weeds, or debris, and then raking the gravel to create a clean surface. Once cleared, place concrete pavers to establish a level and stable base for the water basin. Use a level to ensure the pavers are perfectly flat, adjusting as necessary by raking or adding gravel underneath.
Goal: Prepare the area and create a level base for the water basin
Tools and materials
- Concrete Pavers — Creating a stable and level base
- Level Stanley — Ensuring the base is perfectly flat
- Rake — Spreading and leveling gravel
- Shovel — Removing existing plants and weeds
- Storage Tote — The main water basin for the feature
What they say
(179 characters)Hide
What they say
(179 characters)Auto-generated from the video audio.