After the initial step is set and compacted, the base for the next step is prepared. This involves repeating the process: screed pipes are laid, leveled relative to the previous step, and Class 5 aggregate is spread and compacted. This iterative process ensures that each step is built upon a solid and level foundation, creating a consistent and safe staircase. The mini-excavator can be used to transport and dump the aggregate for the next step's base.
Goal: Lay a level and compacted base for each additional step.
Tools and materials
- 3/4 inch Black Steel Pipes — Acting as screed guides for leveling the base material
- Mini-Excavator Bobcat — Transporting and dumping Class 5 aggregate onto the base area
- Spirit Level — Ensuring the screed guides are perfectly level
- Wooden Board — Used as a straight edge to screed the base material
- Recycled Class 5 Aggregate — The base material being leveled