Prepare Base for Subsequent Steps

12:54
17:41
16.9K views

At 12:54 in

Building a Tricky Staircase

What happens here

After the initial step is set and compacted, the base for the next step is prepared. This involves repeating the process: screed pipes are laid, leveled relative to the previous step, and Class 5 aggregate is spread and compacted. This iterative process ensures that each step is built upon a solid and level foundation, creating a consistent and safe staircase. The mini-excavator can be used to transport and dump the aggregate for the next step's base.

Goal: Lay a level and compacted base for each additional step.

Tools and materials

  • 3/4 inch Black Steel Pipes — Acting as screed guides for leveling the base material
  • Mini-Excavator Bobcat — Transporting and dumping Class 5 aggregate onto the base area
  • Spirit Level — Ensuring the screed guides are perfectly level
  • Wooden Board — Used as a straight edge to screed the base material
  • Recycled Class 5 Aggregate — The base material being leveled

What they say

Hide

the next one man i burned the hell out of my hand on that exhaust twice uh no it doesn't have a throttle cable you gotta hit it on this we gotta we gotta go in the same way rip it [Applause] freaking snap yeah that's why it's so short yeah i just tied it freaking just tied it together it was pretty funny actually you know gave that thing a rip to freaking start somersaulted over [Music] so

Auto-generated from the video audio.