Prepare and Compact the Sub-base
At 2:25 in
Building a Tricky Staircase
What happens here
After the initial excavation, the sub-base is prepared. This involves laying two 3/4 inch black steel pipes parallel to each other on the compacted soil, serving as screed guides. The pipes are then leveled precisely using a spirit level. Recycled Class 5 aggregate (a mix of crushed concrete and asphalt ranging from 3/4 inch down to dust) is spread between these pipes. This material is then compacted using a plate compactor. The compaction is done in multiple 4-inch lifts to ensure a solid and stable base, preventing future settlement. The depth is maintained at 38 inches from the top of the planned step.
Goal: Create a solid, level, and compacted sub-base for the first step.
Tools and materials
- 3/4 inch Black Steel Pipes — Acting as screed guides for leveling the base material
- Hard Rake — Spreading and leveling the aggregate
- Plate Compactor Honda — Compacting the Class 5 aggregate to create a solid base
- Shovel — Spreading aggregate and moving dirt
- Spirit Level — Ensuring the screed pipes and base material are perfectly level
- Recycled Class 5 Aggregate — Forming the compacted base material for the steps