Leveling Base for First Step
5:54
17:41
16.9K views
At 5:54 in
Building a Tricky Staircase
What happens here
After preparing the sub-base, the crew sets up the screed pipes again to establish the precise height for the first pre-cast concrete step. A wooden board is used as a straight edge to perfectly level the Class 5 aggregate between the pipes. This ensures the first step will be installed at the correct height and perfectly flat. This meticulous leveling prevents any unevenness that could affect subsequent steps or create tripping hazards.
Goal: Achieve a perfectly level base for the first pre-cast step.
Tools and materials
- 3/4 inch Black Steel Pipes — Acting as screed guides for leveling the base material
- Rubber Mallet — Gently tapping the pipes into place to achieve desired height
- Spirit Level — Ensuring the screed guides are perfectly level
- Wooden Board — Used as a straight edge to screed the base material
- Recycled Class 5 Aggregate — The base material being leveled
What they say
(547 characters)Hide
What they say
(547 characters)Auto-generated from the video audio.