Leveling Base for First Step

5:54
17:41
16.9K views

At 5:54 in

Building a Tricky Staircase

What happens here

After preparing the sub-base, the crew sets up the screed pipes again to establish the precise height for the first pre-cast concrete step. A wooden board is used as a straight edge to perfectly level the Class 5 aggregate between the pipes. This ensures the first step will be installed at the correct height and perfectly flat. This meticulous leveling prevents any unevenness that could affect subsequent steps or create tripping hazards.

Goal: Achieve a perfectly level base for the first pre-cast step.

Tools and materials

  • 3/4 inch Black Steel Pipes — Acting as screed guides for leveling the base material
  • Rubber Mallet — Gently tapping the pipes into place to achieve desired height
  • Spirit Level — Ensuring the screed guides are perfectly level
  • Wooden Board — Used as a straight edge to screed the base material
  • Recycled Class 5 Aggregate — The base material being leveled

What they say

Hide

[Music] now one of the things i kind of breezed over is the fact that you will see us almost always do multiple lifts even when it's not called for in this case this is only an eight inch stair height tread but we still put the material in and two lifts one four inch lift and a second four inch lift that means that we're going over the entire area twice which gives us double the amount of chance to make sure that we're hitting everything although we could put this lifted in one single lift we found it's better to be safe than sorry put it in