Lay Decking Boards
At 5:54 in
Building a Hand Crafted 2 story deck #2 4K
What happens here
Once the main framing is complete, the decking boards are systematically laid across the joists. The worker uses a level to maintain consistent spacing between boards and to ensure a flat, even surface. An impact driver is utilized to drive screws through the decking boards into the underlying joists, creating a strong and secure deck surface. The boards are typically placed with a small gap between them to allow for drainage and wood expansion/contraction. The process involves measuring, cutting boards to length as needed, positioning, and fastening, working methodically along the length of the deck.
Goal: This step involves carefully positioning and securing the decking boards onto the installed framing. The worker uses a level and impact driver to lay the boards, ensuring they are evenly spaced and firmly attached.
Tools and materials
- Deck Screws
- Decking Boards
- Impact Driver
- Measuring Tape
- Spirit Level
What they say
(168 characters)Hide
What they say
(168 characters)Auto-generated from the video audio.