Position and Tack Weld Dump Bed Floor
10:17
21:23
1M views
At 10:17 in
Building a Dump Trailer by hand-Start to Finish FULL time lapse
What happens here
The large, heavy steel plate that forms the main floor of the dump bed is carefully maneuvered and slid into position atop the supporting cross members. The team ensures precise alignment and a flush fit before tack welding the plate to the frame, temporarily securing it for further full welding to ensure a robust and stable base for the dump bed.
Goal: Install the main floor panel of the dump bed.
Tools and materials
- Forklift Doosan — To assist in positioning the heavy plate
- Protective clothing — Body protection from sparks and heat
- Steel floor plate — Main floor of the dump bed
- Welding gloves — Hand protection from heat and sparks
- Welding helmet — Eye and face protection during tack welding
- Welding machine Lincoln Electric — For tack welding the floor plate to the frame
What they say
(160 characters)Hide
What they say
(160 characters)Auto-generated from the video audio.