Skip to main content

Install Deck Boards

1:02
11:59
13.7K views

At 1:02 in

Building a 2 story deck gets scary fast 4K

What happens here

Using an aerial lift for safety and accessibility, position the deck boards onto the prepared framework. Secure each deck board by drilling pilot holes and then driving screws (specifically SPAX PowerLags are shown) into the boards and into the underlying joists. Ensure proper spacing between boards for drainage and expansion. The installation involves working along the length of the deck, securing each board sequentially.

Goal: Securely attach deck boards to the structural framework.

Tools and materials

  • Aerial Lift Almacrawler Equipment — Providing elevated access to the second-story deck for installation
  • Deck Boards — The walking surface of the deck
  • Impact Driver Milwaukee — Driving screws into deck boards and joists
  • SPAX PowerLags SPAX — Securing deck boards