Install Deck Boards and Railing Frame

1:01
11:59
13.7K views

At 1:01 in

Building a 2 story deck gets scary fast 4K

What happens here

Once the individual deck boards are sufficiently dry from pre-staining, carefully position and secure them onto the existing second-story deck frame using appropriate decking screws. Following the decking, assemble the main handrail frame. This involves installing vertical posts and horizontal support rails, all of which should have been pre-stained in the previous step. Ensure all connections are secure and level, as this forms the base for the rest of the railing system.

Goal: After staining, the deck boards are installed onto the second-story deck frame, followed by the assembly and installation of the pre-stained wooden handrail frame.

Tools and materials

  • Cordless Drill
  • Decking Screws
  • Level