Skip to main content

Utilizing Heavy Equipment for Ice Removal

1:21
16:03
265K views

At 1:21 in

Broke Down in a 3 day Ice Blizzard / 20 hour snow storm & Fed up with People 4 k video

What happens here

A large yellow SDLG loader, equipped with a wide Arctic sectional snow plow, is shown clearing a broader road area. This heavier machinery is deployed to tackle the severe ice and compacted snow. The narrator emphasizes that the persistent frozen rain layer made even powerful equipment like this less effective than usual, requiring aggressive plowing techniques.

Goal: Employ larger machinery to effectively remove severe ice and snow from wider areas.

Tools and materials

  • SDLG Loader SDLG — Heavy-duty snow and ice removal from large areas
  • Ice N/A — The challenging frozen layer
  • Snow N/A — The material being cleared

What they say

Hide

when you got a load of snow on so it should have been a pretty straightforward easy plow event but this one was anything but that this one in fact actually kicked our button we had three days of rain and that kept us from pre-treating the lads and then that froze up leaving about a half inch of ice beneath all of the snow that followed behind it making it our biggest most effective equipment useless hey Alex will you go give that a push onto the pile to put the front plow right up on that pile you still running the same plow you still got that moose country wow how you

Auto-generated from the video audio.