Skip to main content

Discussion on Costs, Materials, and Future Plans

7:58
17:38
44.5K views

At 7:58 in

Bringing in the heavy loads!

What happens here

Josh discusses the financial aspect of the project, stating that each load of gravel costs approximately $450, and they will need about five loads for the entire project. He then addresses a common question about not using plastic or felt fabric as an underlayment for the gravel. He explains that this is intentional because using a box scrape for future maintenance would rip up the fabric, creating a bigger mess. He believes that a sufficiently thick layer of gravel (dumped thick and heavy) negates the need for fabric. He also briefly mentions future plans to build a large 50x100 foot building for a butchery shop, offices, and classes, which will require more gravel and ground preparation.

Goal: Understand the financial cost and material choices for driveway construction, and learn about future farm developments.

Tools and materials

  • Box Scrape Titan — Leveling and spreading gravel (mentioned as a reason to avoid fabric)
  • Tractor — Operating the box scrape (mentioned)
  • Gravel — The main material for the driveway
  • Plastic or Felt Fabric — Underlayment (discussed but not used)