Continue Laying Tiles and Use Leveling System
At 10:32 in
Bathroom Remodel Pt.3 Laying Floor Tile
What happens here
Apply thinset to the membrane and back-butter each tile. Lay tiles in the chosen staggered pattern, pressing them firmly. Insert the leveling clips (bases) under the edges of each new tile. Once adjacent tiles are in place, slide the blue wedges into the clip bases and use the specialized compression tool to tighten them. The tool has a dial to set the desired compression, ensuring consistent pressure across all tiles for a perfectly level finish. Pay close attention to placing shims correctly at all corners and along edges to avoid having to re-lift tiles later.
Goal: Continue laying tiles in a staggered pattern, inserting leveling clips, and using the wedge and compression tool to ensure a perfectly level surface.
Tools and materials
- 1/2 inch Trowel
- Mapei Uncoupling Membrane Mortar (mixed)
- Porcelain Tiles
- Tile Leveling Clips (bases and wedges)
- Tile Leveling Compression Tool
What they say
(992 characters)Hide
What they say
(992 characters)Auto-generated from the video audio.