Prepare Base for Blocks
At 14:02 in
Bad Start on the First Day
What happens here
After installing the French drain, spread a final layer of drainage rock (typically gravel or crushed stone) to form a level bed for the first course of blocks. Compact this layer thoroughly using a vibratory plate compactor to create a firm, stable foundation. For wet or unstable soils, incorporate a layer of geogrid into the base. Geogrid acts as a large 'snowshoe', interlocking with the aggregate to distribute weight and prevent settlement, especially critical in areas prone to a high water table or freeze-thaw cycles. Ensure the base is perfectly level, using a long level or a laser level, as this will dictate the stability and appearance of the entire wall.
Goal: Create a stable and level base for the first course of cinder blocks by compacting the drainage rock and incorporating geogrid for stability.
Tools and materials
- Laser Level
- Plate Compactor
- Shovel
- Drainage Rock (Crushed Stone)
- Geogrid
What they say
(722 characters)Hide
What they say
(722 characters)Auto-generated from the video audio.