Build Additional Courses of Retaining Wall
At 16:24 in
Bad Start on the First Day
What happens here
Once the first course is securely in place, begin stacking additional courses of the retaining wall blocks. Ensure each block is level and properly aligned with the course below it. For a strong and durable wall, backfill behind each course with drainage rock (clean gravel) as you build up. This allows water to drain freely, reducing hydrostatic pressure on the wall. The video shows the use of heavy machinery to move large quantities of rock. Periodically check the level and alignment of the wall as you build to prevent tilting or unevenness. The new wall aims to address the previous wall's failure due to improper drainage and backfill.
Goal: Continue stacking subsequent courses of cinder blocks, ensuring each layer is level and incorporating proper backfill and drainage behind the wall.
Tools and materials
- Heavy Machinery (Excavator/Skid Steer)
- Rubber Mallet
- Spirit Level
- Cinder Blocks
- Drainage Rock (Clean Gravel)
What they say
(1,127 characters)Hide
What they say
(1,127 characters)Auto-generated from the video audio.