Prepare Base and Lay First Course of Blocks
At 13:44 in
Bad Start on the First Day
What happens here
After installing the drainage system, backfill the excavated area with drainage rock (base aggregate). Use a plate compactor to thoroughly compact the rock base, ensuring a solid and level foundation for the retaining wall. Incorporate geogrid layers within the rock base and between courses of blocks, especially in areas with wet or spongy soil, to provide additional stability and act as a large 'snowshoe' for the wall. Carefully lay the first course of retaining wall blocks, ensuring they are perfectly level using a spirit level and rubber mallet. This initial course is critical for the integrity and appearance of the entire wall.
Goal: Establish a level and stable base with compacted drainage rock and geogrid before carefully laying the first course of retaining wall blocks.
Tools and materials
- Hand Tamper (optional)
- Plate Compactor
- Rubber Mallet
- Shovels
- Spirit Level
- Cinder Blocks
- Drainage Rock (Base Aggregate)
- Geogrid
What they say
(1,876 characters)Hide
What they say
(1,876 characters)Auto-generated from the video audio.