Skip to main content

Preparing the Installation Area

1:15
22:22
6.9K views

At 1:15 in

Backup Emergency HEAT

What happens here

Before installation, the bed frame in the room is partially disassembled and moved to clear the corner designated for the pellet stove. This step ensures adequate space for working and proper placement of the stove, allowing for necessary clearances.

Goal: The designated corner of the cabin is cleared by moving furniture to make space for the pellet stove installation.

Tools and materials

  • Bed Frame

What they say

Hide

make it to my propane tank and two of my houses almost froze completely out and if I can't and it was there was so much snow up North 120 in and it kept falling that if I can't clear a path I can't get a propane truck up my houses will freeze out so I want to put up a secondary backup source of heat that does not require Pro me to bre put all of my eggs in one basket because anytime you do that

Auto-generated from the video audio.