Preparing the Installation Area
1:15
22:22
6.9K views
At 1:15 in
Backup Emergency HEAT
What happens here
Before installation, the bed frame in the room is partially disassembled and moved to clear the corner designated for the pellet stove. This step ensures adequate space for working and proper placement of the stove, allowing for necessary clearances.
Goal: The designated corner of the cabin is cleared by moving furniture to make space for the pellet stove installation.
Tools and materials
- Bed Frame
What they say
(397 characters)Hide
What they say
(397 characters)Auto-generated from the video audio.