Skip to main content

Prepare the Installation Area

0:00
0:39
10.5K views

At 0:00 in

Any questions about these skylifts we use?!

What happens here

Begin by preparing the installation area. Use an oscillating multi-tool equipped with a cutting blade to carefully remove any existing wood, trim, or other obstructions from the designated spot where the railing post will be installed. The goal is to create a clean, flat, and stable surface on the ledger board or framing. After cutting, use a hammer to tap away any remaining loose wood pieces, nails, or debris, ensuring the area is completely clear and level. This precise preparation is crucial for the stability of the new post base.

Goal: Create a clean, flat, and stable surface for the post base.

Tools and materials

  • Cutting Blade — Attached to the oscillating multi-tool for wood cutting
  • Hammer — Removing loose wood pieces, nails, and debris
  • Oscillating Multi-Tool — Cutting and removing existing wood or trim
  • Wood Debris N/A — The old material being removed from the installation site