Skip to main content

Place Steel Rebar for Concrete Reinforcement

12:04
17:16
42.8K views

At 12:04 in

Alex is Blinded with Hydraulic oil. #1

What happens here

Once the trench is excavated and the grade is set according to the string line, workers begin placing the steel rebar. The rebar is laid horizontally along the bottom of the trench, often supported by small concrete blocks or rebar chairs to ensure it is correctly suspended within the future concrete slab. The rebar is positioned to provide structural integrity to the concrete, which will form a new perimeter around the building. This reinforcement helps to distribute loads, resist tensile forces, and mitigate the effects of frost heave and soil movement, preventing cracking and structural damage to the building's foundation.

Goal: Steel rebar is carefully laid into the excavated trench, positioned for concrete pouring to reinforce the foundation and prevent future structural issues.

Tools and materials

  • Rebar Chairs/Spacers
  • Steel Rebar

What they say

Hide

hey i heard you got hit yeah with the hydraulic line sprayed in the face with hydraulic what happened are you okay yeah i'm fine it just it was hot and it burned a little bit but yeah i mean look inside the cabin you can see it i mean i already wiped it down a pretty good amount but you can see it it was sprayed all over inside of there i i heard it and i was like right away instantly just i felt it right into my face it had to straight shot into my face as we saw it sprayed up over the kit over the it was like a cloud it was what did you do i just started rinsing water in my eyes and wiping my face off and i looked up on the poison control center and they said just rinse your eyes keep blinking while you're rinsing it did it had been running for a while or did it just start up or 45 minutes or so oh dude it was as hot as it was gonna be yeah it was as hot as it's gonna get i don't know if you're running it all day it got even hotter but it wasn't i didn't burn that bad um how's this going it's going we won't talk about that steel edgy like tim and i were talking you guys are having a bit of a challenge on the steel edging and uh mainly just getting these heights set here because in a lot of these front yards we don't have much pitch to work with so we got to get this down low enough to where we can have an inch or so out of the ground and still have good pitch out of there he's having water problems and frost keeping four feet off from the building so i wanted to give it enough pitch to where when it heaves in the in the winter again it's just going to kind of balance it out yeah so you're shaving this down aren't you yeah this is right there it was a big old hump here we shaved this down probably two three inches already so far oh alex and i were on the phone fighting with uh and tim we've all been fighting with the gopher state did you finally get the locates all done yeah i got a hold of the area manager tim gave me his number and he called the guy and he was out here within an hour so because we we had been the locates they were supposed to be done seven days ago right came out not a locate and you were you got on the phone and and then two days i tried to call them or two times i try to call him that morning and then you try to call him a third it was the same thing tim got the same thing never heard back so what i did was and uh sometimes they call you to see if you can delay markings actual people on um you have people that mark there's a i uh i…

Auto-generated from the video audio.