Demolish and Fold Pool Wall Panels
At 5:40 in
A Contractor Abandoned this job & buried Garbage at the Customers House pt1 . 4 k video
What happens here
The excavator's focus shifts to the structural elements of the pool: the metal side walls. The operator uses the grapple to break down and then meticulously fold these large metal panels. A yellow ASV RT-75 compact track loader assists by pushing the metal panels against the excavator, allowing them to be folded as tightly as possible. This practice is crucial for maximizing the amount of material that can be transported on a single truck, thereby reducing transportation costs and environmental impact. The narrator explains that minimizing soil contamination on these panels is also a priority.
Goal: This step involves the careful demolition and tight folding of the swimming pool's metal side walls to reduce their volume for efficient transportation and disposal.
Tools and materials
- ASV RT-75 Compact Track Loader
- Daewoo 75V Excavator
- Hydraulic Grapple Attachment
What they say
(554 characters)Hide
What they say
(554 characters)Auto-generated from the video audio.