Skip to main content

Mark Post Locations and Begin Hole Digging

0:05
23:53
18.3K views

At 0:05 in

$50 Farm Fence at 1/4 cost of chainlink

What happens here

Using measuring tape and marker flags, precisely lay out the fence line and mark the exact locations where each post will be installed. The posts are planned to be spaced 10 feet apart on center. Once marked, utilize a compact track loader (like the ASV RT-40 with a Bobcat auger attachment) to efficiently dig the post holes. The holes will be dug to a depth of 3 feet below ground level. This step is crucial for establishing the fence's perimeter and ensuring consistent post spacing. If heavy machinery is not available, manual post hole diggers can be used, though this will significantly increase the time and physical effort required.

Goal: Measure and mark the precise locations for each fence post, then use heavy machinery with an auger attachment to dig the post holes efficiently. The posts will be spaced 10 feet apart and buried 3 feet deep.

Tools and materials

  • Bobcat Auger Attachment
  • Compact Track Loader (ASV RT-40)
  • Marker Flags
  • Measuring Tape
  • Post Hole Digger (manual)

What they say

Hide

it all started with you I built all of the fence from that point all the way down the yard and around the corner for less than half of the price that I built this little tiny section of ugly looking privacy fence and one qu of the price of what a chain length fence would cost actually less than one qu of the price of what a chain link fence would cost

Auto-generated from the video audio.