Install Posts and Backfill with Concrete
At 0:08 in
$50 Farm Fence at 1/4 cost of chainlink
What happens here
Carefully place each 4x4x10-foot pressure-treated timber post into its designated 3-foot deep hole. Use a post-level (a specialized level that attaches to the post) to ensure the post is perfectly vertical on all sides (front-to-back and left-to-right). Once leveled, carefully pour dry concrete mix (pre-blended general purpose concrete) directly into the hole around the post. For areas with very wet or challenging soil conditions, increase the amount of concrete to three 60lb bags (180 lbs) per post for enhanced stability and to encapsulate the post, protecting it from rot. The concrete will absorb ground moisture and harden over time, creating a strong and stable base. Avoid pre-mixing the concrete with water as the ground moisture is usually sufficient for curing in this application.
Goal: Place the pressure-treated posts into the dug holes, ensuring they are level, then backfill around each post with dry concrete mix. The concrete will harden over time with ambient moisture, providing a solid foundation.
Tools and materials
- Post Level
- Shovel
- Dry Concrete Mix Mastercraft
What they say
(353 characters)Hide
What they say
(353 characters)Auto-generated from the video audio.