Engineer Consultation for Slope Re-grading
At 5:52 in
3 Days at Work Excavating, Landscaping, Demolition, Construction & Lawn Care running outdoor jobs
What happens here
The speaker visits the Eagan Municipal Center to consult with an engineer regarding the removal of existing retaining walls and the re-grading of a slope that leads to a pond. The goal is to establish a new 2-to-1 slope (an acceptable variance from the standard 3-to-1 for unmanaged slopes) and replant vegetation. The plan also includes using bio-logs or silt fencing along the pond's edge to prevent erosion during the process.
Goal: This step details a consultation with a municipal engineer to plan the removal of retaining walls and re-grading a slope, including implementing erosion control measures and achieving specific slope ratios.
Tools and materials
- Bio-logs or Silt Fence
- Vegetation
What they say
(2,492 characters)Hide
What they say
(2,492 characters)Auto-generated from the video audio.