Engineer Consultation for Slope Re-grading

5:52
11:31
253.5K views

At 5:52 in

3 Days at Work Excavating, Landscaping, Demolition, Construction & Lawn Care running outdoor jobs

What happens here

The speaker visits the Eagan Municipal Center to consult with an engineer regarding the removal of existing retaining walls and the re-grading of a slope that leads to a pond. The goal is to establish a new 2-to-1 slope (an acceptable variance from the standard 3-to-1 for unmanaged slopes) and replant vegetation. The plan also includes using bio-logs or silt fencing along the pond's edge to prevent erosion during the process.

Goal: This step details a consultation with a municipal engineer to plan the removal of retaining walls and re-grading a slope, including implementing erosion control measures and achieving specific slope ratios.

Tools and materials

  • Bio-logs or Silt Fence
  • Vegetation

What they say

Hide

both sites with me today. Let's see how this goes. So, that's what we're up against down there. We got to try to we got to get all the logs out. And then we got this wall that's already fallen down here. So, we got our game plan, right, Dave? We're going to put bologs or silk fence along the edge of the pond. Yep. Then we're going to actually use the street to drop our materials. We may have to bridge this area coming in. If we build a bridge using soil, we'll take it out. Okay, cool. Then what we're going to do is we're going to do a 2:1 slope down here and then reestablish vegetation. Okay. Normally it has to be a 3 to one, but because it's a un unmanaged slope, we can go two to one. Right. Perfect. How about the only thing again the the disclaimer, we don't allow you dumping on the street itself. So you can access from the street back onto the boulevard and dump it there. Makes our life even easier. Technically, that's a lie. I'd rather work off a hard surface any day. There's just a lot less to restore. Do you want to help me spread this mulch out? Sounds good to me. And then obviously you'll have to restore that when you're done. So, and you want lots of buckthorn planted right there. Oh, yeah. I love that. Grows nice and deep. So, while we've got the engineer with us, let's go check out the next spot. So, here's the job site. We're going to be removing this retaining wall. There's bringing fill soil in front of it. What about dirt on the street here though cuz I don't know. Definitely not. Can't do that. Huh. We just overlaid this. So Dave started to tell us a story about our competition when they decided to store their materials on a brand new street and it happened to be about 102° out. Let's find out what happens. It's one of those days it was like 102 out. Oh no. Melted. Cost them. I think we sent him a a bill for like $10,000 cuz we had to come through and mill from the edge out to the center line and grind up the black top and repave it. So, they did that job for free pretty much. Yep. Okay. Make a mental note. Don't dump material in a hot street. Especially if the city knows you're going to do it. Exactly. Pop quiz. How many acres do we maintain out here? Eight. No, keep going. I'd say 15. No, keep going. What do we got? 20. 20. 20 30 20 It's either 23 or 26 acres. Okay. Really? Yeah. It's pretty dang good. We just ran into a guy. I just saw a guy that had the Gas Monkey shirt on. Yeah. Car garage. There you go. There it is. What's up…

Auto-generated from the video audio.