What happens here

For another project, the crew needs a custom-sized countertop that standard hardware stores do not stock. This necessitates purchasing a longer stock piece (e.g., a 12-foot section when a 14-foot section is needed) and planning to 'seam' multiple pieces together, highlighting common challenges in material procurement for specific renovation tasks.

Goal: This step shows the process of purchasing a countertop from Menards and addresses the challenge of custom sizing by planning to seam multiple standard-sized pieces.

Tools and materials

  • Truck
  • Countertop Material

What they say

Hide

it out to Lakeville. How close do you guys how much longer do you guys got out here? I just finished the pond and blowing everything off for off the streets at least. Then we just got backpack and weed whipped. Couple hours or not really? Uh, I'd say 2 hours. 2 hours. So, I got It gives me 2 hours to get a countertop, haul it out to Lakeville, drop it off, and get back here. Plenty of time. He says that with so much confidence. It's the keys to the Mustang. I need those for in case Ariel calls you and you have to run. Okay. He's got a brand new baby. It's my grandson, so I should know. That's Jake. And your new son's name is Finn. Finn. Finley. Adventure Time. Come grab your friends. Come to very distant lands. Jake the dog and Finn the human. Adventure. Adventure time. Let's see if I nailed that song. Come on, grab your friends. We'll go to veryant. [Music] adventure. So, here's the deal. The construction crew has to put a new countertop in my favorite store. Boom. Yeah, but they don't make 14. So, we got to seam it. What do they make? They make twelves, 10, eights, sixes, and fours. If you work at Menard's, no offense, the one thing I've noticed, these guys are really good at not helping load. So, the construction crew is doing a complete house renovation and flip. My job is to make sure that they have everything they need to do their job. I mean, we can't even begin to go over everything that we've done to this thing. And when I say we, how much did I help you? Quite a bit. He is lying. The only thing I've done is get out of your way. Part of my job is to make sure that the crews move seamlessly from one project to the next. That means I've got to stay ahead of them on all of the engineering, permitting, and planning processes. Let's see how that goes. Now, where's all my raspberries? Now, I've got two project where I'm removing retaining walls and not rebuilding them, but I'm still going to meet with the engineer. Unfortunately, I can't get this guy to call me back. So, I'm going to go knock on his door instead. Even though I'm not technically building anything, I want to cover all my bases because I'm going to be altering the grade enough that it could raise a red flag. And before that red flag gets thrown in my face, I'm going to make sure that I got everything taken care of. So, let's see what happens. Now, I've worked many times with the city of Egan. And actually, they're one of my favorite cities to work with. These guys got it together. A few…

Auto-generated from the video audio.