Fabricating the Turbo Mounting Jig
At 6:23 in
1500HP Twin Turbo Coyote Mustang Build: My Second Turbo Kit EVER! (From The Archives)
What happens here
A custom mounting jig is fabricated from steel angle iron to precisely position and hold the turbos in place during the pipe fabrication and tack-welding process. The jig is designed to attach to the car's core support. The builder emphasizes the importance of accurately setting up the "harder" side (the side with less space and more complex routing) first. A hole is drilled in the jig to allow a pole to screw into the turbo, enabling flexible positioning. Once the turbos are properly aligned with the jig, they will be tack-welded to ensure their position.
Goal: Create a custom jig for precise turbo placement and tack welding.
Tools and materials
- Chop Saw DeWalt
What they say
(2,021 characters)Hide
What they say
(2,021 characters)Auto-generated from the video audio.