The final step before you can insulate and hang drywall is the rough-in inspection. The plumbing inspector will return to check all of your work. They will verify that the DWV and supply lines are installed correctly, properly supported, and meet all code requirements. They will likely require a pressure test on both the DWV and the supply lines. For the DWV system, this involves sealing the system with a test ball or inflatable plug and filling it with water up to a certain level (or pressurizing it with air) to check for leaks. The supply lines will be tested under normal house pressure. Do not proceed with wall coverings until you have passed this final plumbing inspection.
This guide provides a comprehensive, step-by-step process for roughing in the plumbing for a new basement bathroom. The process covers everything from initial planning and obtaining permits, to breaking concrete for drainage, installing the Drain-Waste-Vent (DWV) system, running hot and cold water supply lines, and preparing for final inspection before closing up the floors and walls.
This project is rated intermediate due to the need for precise measurements, concrete work, and understanding plumbing codes. For an experienced DIYer, it can take 3-5 full days of work, not including permit acquisition and inspection wait times. Beginners should consider professional help for critical steps like concrete cutting and main line tie-ins.
You will almost certainly need a plumbing permit and possibly a building permit. Contact your local building department early in the planning phase to understand all requirements, necessary inspections (like the rough-in inspection), and specific code regulations for pipe sizing, slope, and venting to avoid costly rework.
A demolition hammer or electric jackhammer is highly recommended for efficiency, which can often be rented. Wear heavy-duty work gloves, steel-toed boots, eye protection, hearing protection, and a dust mask to protect against concrete dust and flying debris. Be mindful of existing utility lines marked during the planning phase.
Common mistakes include incorrect pipe slope, inadequate solvent welding, and insufficient depth for drain lines. Ensure a consistent slope of at least 1/4 inch per foot for proper drainage, use proper primer and cement for strong, leak-free joints, and confirm all pipes are securely bedded in gravel to prevent shifting.