Set the Drain Trap in Concrete — Planning, Layout, and Permits

Intermediate

Part of project

How to Rough-In Plumbing for a Basement Bathroom · Step 1 of 7

Helpful?

In this video

This step details the critical preparation for installing a low-profile shower tray directly on a concrete floor. First, excavate a channel in the concrete floor to accommodate the P-trap and waste pipe. Dry fit the shower tray and waste trap to determine the exact final position and height. Create a formwork around the excavated area using scrap wood. Mix a wet concrete/cement mixture and pour it into the excavation around the waste pipe. Place the shower tray back into its final position on the wet concrete to press the drain trap to the correct height and orientation. Ensure the tray is level. Leave the shower tray in place for 24 hours to allow the concrete to set, permanently fixing the drain trap in the perfect position. After curing, remove the shower tray for the next steps.

Goal: Securely position the drain trap

  • This is the most crucial step for a low-profile installation. An incorrect drain position is very difficult to fix once the concrete has cured.
  • Mark the final height of the concrete on the wall as a reference to guide your installation.

Used in this video

  • Trowel (Tool Type: Hand Tools)Applying and shaping concrete.
  • Spirit Level (Tool Type: Measuring Tools)Ensuring the shower tray is level when setting the drain position.
  • Scrap Wood (Material: Wood)Creating a formwork for the concrete pour.
  • Shower Tray (Material: Composite)Used as a template to set the final height and position of the drain trap.
76.7K views19860 minutes (plus 24 hours curing time)
Home Repair Tutor

671K subscribers

View Channel

FAQs

How difficult is roughing in basement bathroom plumbing for a DIYer, and how long does it typically take?

This project is rated intermediate due to the need for precise measurements, concrete work, and understanding plumbing codes. For an experienced DIYer, it can take 3-5 full days of work, not including permit acquisition and inspection wait times. Beginners should consider professional help for critical steps like concrete cutting and main line tie-ins.

What permits do I need, and how do I ensure my rough-in plumbing passes inspection?

You will almost certainly need a plumbing permit and possibly a building permit. Contact your local building department early in the planning phase to understand all requirements, necessary inspections (like the rough-in inspection), and specific code regulations for pipe sizing, slope, and venting to avoid costly rework.

What's the best way to break up the concrete floor, and what safety precautions should I take?

A demolition hammer or electric jackhammer is highly recommended for efficiency, which can often be rented. Wear heavy-duty work gloves, steel-toed boots, eye protection, hearing protection, and a dust mask to protect against concrete dust and flying debris. Be mindful of existing utility lines marked during the planning phase.

What are the most common mistakes when installing the underground DWV pipes, and how can I avoid them?

Common mistakes include incorrect pipe slope, inadequate solvent welding, and insufficient depth for drain lines. Ensure a consistent slope of at least 1/4 inch per foot for proper drainage, use proper primer and cement for strong, leak-free joints, and confirm all pipes are securely bedded in gravel to prevent shifting.

Set the Drain Trap in Concrete — How to Rough-In Plumbing for a Basement Bathroom (Step 1, Video 1) | Stesso