Skip to main content

Tighten Connections and Test for Leaks — Restore Water and Check for Leaks

Beginner

Part of project

How to Replace a Leaky Angle Stop (Shutoff Valve) Under Your Sink · Step 9 of 10

Helpful?

In this video

With the regulator in place and hand-tightened, use the pipe wrench to fully tighten both the top and bottom nuts to ensure a secure, leak-proof connection. Once both are tight, slowly turn the main water supply valve back on. Listen for the sound of water filling the pipes and carefully inspect both connections for any signs of dripping or leaking. Finally, open the nearby faucet to confirm that water is flowing properly.

Goal: Finalize Installation and Test

  • Turn the water back on slowly. A sudden burst of pressure could cause a loose connection to fail.

Used in this video

  • Pipe Wrench (brand: Husky, Tool Type: Pipe wrench, Size: Large, Size/Dimension: 18 in)Applying final torque to tighten the nuts and secure the regulator.
177.1K views32351 seconds
Know How Now

89K subscribers

View Channel

FAQs

What should I do if the old compression nut and ferrule are seized onto the copper pipe?

Apply penetrating oil, like Blaster PB Penetrating Oil, directly to the nut and ferrule. Allow it to soak for 15-30 minutes before attempting to loosen it again with your adjustable wrench. If it's still stuck, you may need to carefully cut the old ferrule off with a small hacksaw or specialized tool, taking care not to damage the copper pipe itself.

How can I prevent leaks after installing the new angle stop?

Ensure the copper pipe is clean, smooth, and free of burrs or scratches where the new ferrule will sit. Hand-tighten the compression nut first, then use your adjustable wrench to tighten it an additional half to three-quarters of a turn. Avoid overtightening, as this can damage the ferrule or pipe, but ensure it's snug enough to prevent drips.

Do I really need to shut off the main water supply for this project?

Yes, absolutely. Shutting off the main water supply is crucial to prevent significant flooding when you remove the old valve. Always relieve any remaining water pressure by opening a nearby faucet after shutting off the main supply, before starting work under the sink.

How long should this project typically take for a beginner?

For a DIY beginner, expect this project to take approximately 1 to 2 hours. This accounts for time to gather tools, carefully follow each step, and troubleshoot minor issues like a stubborn old valve or initial small leaks. Taking your time will help ensure a successful installation.

Tighten Connections and Test for Leaks — How to Replace a Leaky Angle Stop (Shutoff Valve) Under Your Sink (Step 9, Video 2) | Stesso