Loading...
Using a rag or paper towel, carefully wipe away any excess silicone sealant that may have squeezed out from the sides of the extender. This provides a clean, professional finish. Allow the silicone to cure according to the manufacturer's instructions (typically 12-24 hours for a full cure) before subjecting the area to heavy use, although the toilet can generally be installed immediately. The flange is now at the correct height and is ready for the toilet installation to be completed.
This guide provides comprehensive, step-by-step instructions for installing a toilet flange extender kit after new flooring, such as tile, has been installed. The process involves thoroughly cleaning the old flange, accurately measuring the required height extension, dry-fitting the extender, creating a waterproof seal with silicone, and securely fastening the extender to the subfloor. This ensures a proper foundation for reinstalling the toilet and prevents future leaks.
Tiling often raises the floor level, causing the existing toilet flange to sit too low. This prevents the wax ring from creating a proper, watertight seal, leading to potential leaks. You know you need an extender if the top of your existing flange is below the new finished floor level.
This project is rated as 'beginner' difficulty because it primarily involves careful measurement, cleaning, and sealing, not complex plumbing pipework. Most DIYers can complete it in approximately 3 hours, assuming all necessary tools and materials are readily available.
Beyond basic tools like a tape measure and caulk gun, a quality toilet flange extender kit and a reliable silicone sealant are critical. Don't skip on robust #10 3โ wood screws for securely fastening the extender to the subfloor, as any movement can compromise the seal. Thorough cleaning materials are also essential.
The most common mistakes include not thoroughly cleaning the old flange, failing to apply sufficient silicone sealant for a waterproof bond, and not securing the extender firmly to the subfloor. Always dry-fit the extender to ensure the correct height (flush or slightly above the finished floor) before applying sealant.
Start your project
chat with your ai