Secure First Bracket — Mark Bracket Positions
Part of project
How to Install a Handrail on a Plaster Wall · Step 2 of 5
In this video
Once the stud location is verified, use a level to draw a plumb line (vertical line) on the wall through the center of the confirmed stud. This line will guide the vertical placement of the handrail brackets. For the first bracket, attach it to the wall by screwing a temporary drywall screw into the bottom screw hole, ensuring it penetrates the stud. This allows for final adjustments without damaging the aesthetic 'finished' screws. Once the bracket is properly aligned and level, remove the temporary screw and install two permanent, finished screws into the top and bottom holes of the bracket, making sure both penetrate the wall stud securely.
Secure First Bracket — Mark Bracket Positions
Part of project
How to Install a Handrail on a Plaster Wall · Step 2 of 5
In this video
Once the stud location is verified, use a level to draw a plumb line (vertical line) on the wall through the center of the confirmed stud. This line will guide the vertical placement of the handrail brackets. For the first bracket, attach it to the wall by screwing a temporary drywall screw into the bottom screw hole, ensuring it penetrates the stud. This allows for final adjustments without damaging the aesthetic 'finished' screws. Once the bracket is properly aligned and level, remove the temporary screw and install two permanent, finished screws into the top and bottom holes of the bracket, making sure both penetrate the wall stud securely.