Skip to main content

Reinstall Baseboards and Final Transitions — Install Transition Strips and Trim

Beginner10 mins

Part of project

Flooring & Tiling · Step 10 of 11

Helpful?

In this video

After all the vinyl planks are installed, the final step is to reinstall the baseboards (if removed). Place the baseboards back in their original positions and secure them with finish nails. This covers the expansion gap around the perimeter of the room, creating a clean, finished look. Additionally, install the T-molding transition strip into the pre-installed U-channel at the doorway. Use a rubber mallet to gently tap the T-molding into the channel until it is securely seated. This completes the transition, even if there's a slight height difference between the vinyl plank and the adjacent flooring. Ensure the manufacturer's recommendations are followed, especially regarding underlayment. Some vinyl planks have built-in underlayment and may void the warranty if an additional underlayment is used.

15.1M views131.9K

FAQs

This project is listed as 'beginner' but has an estimated time of '10 days.' What makes it take so long, and is it truly suitable for a beginner?

The '10 days' often accounts for important steps like material acclimation, subfloor drying times, and working at a steady, beginner-friendly pace. While individual steps like measuring and cutting require patience and precision, they don't demand advanced skills. Breaking the project into manageable daily tasks makes it very approachable for DIY novices.

Why is subfloor preparation so important, and what are common issues to look out for before installing new flooring?

A properly prepared subfloor is critical for the longevity and aesthetic of your new floor. Unevenness, moisture, or movement in the subfloor can lead to squeaks, gaps, or even damage to your new flooring over time. Check for loose boards, significant height variations, and any signs of moisture damage, addressing these thoroughly before installation.

The materials list mentions interlocking EVA foam flooring. Are the steps provided suitable for other types of flooring, like traditional tile or hardwood?

While the project specifically lists EVA foam, many core steps like existing floor removal, subfloor preparation, and general layout principles apply to various flooring types. However, installing traditional tile or hardwood would require different specialized tools (e.g., a wet saw for tile, a flooring nailer for hardwood) and specific adhesives or fastening methods not detailed here.

What are the most essential tools for this flooring project, especially for someone on a budget?

Beyond common household items, a reliable retractable utility knife for precise cuts, a sturdy pry bar set for efficient removal of old flooring and trim, and an accurate tape measure are crucial. A level is also important for subfloor assessment. Investing in these key items will contribute significantly to a successful outcome.