Step 2 · Stabilize the Base Material

If the excavated area is unstable or has washed out, you will need to add new base material. Begin by adding a layer of crushed gravel (e.g., ¾-inch minus). Spread the gravel evenly and compact it thoroughly using a hand tamper or a plate compactor. Add subsequent layers of gravel, compacting each layer, until you reach the desired height. If the original base was sand, you may opt to use a paver base sand or a blend of sand and gravel for better drainage and stability. Ensure the new base material is compacted to create a firm surface that will not shift.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Stabilize the Base Material

If the excavated area is unstable or has washed out, you will need to add new base material. Begin by adding a layer of crushed gravel (e.g., ¾-inch minus). Spread the gravel evenly and compact it thoroughly using a hand tamper or a plate compactor. Add subsequent layers of gravel, compacting each layer, until you reach the desired height. If the original base was sand, you may opt to use a paver base sand or a blend of sand and gravel for better drainage and stability. Ensure the new base material is compacted to create a firm surface that will not shift.

Videos for this step

Replace the basePrepare the Stable BasePlace and Compact Your Base Material

Tools and Materials

← Project

How to Level a Sinking Paver Step

Step 2 of 4·5.5 hr left

Excavate Around the Paver Step
120 minutes3 items
2
Stabilize the Base Material
180 minutes4 items
3
Re-level and Set Pavers
90 minutes4 items
4
Backfill and Compact Edges
60 minutes4 items