Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 7 · Prime the Paneling

Ensure all filler and caulk are completely dry. Apply a high-quality primer evenly over all the boards and battens. Pay attention to covering all surfaces, including the edges and any areas that were filled. Allow the primer to dry completely according to the product instructions.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Prime the Paneling

Ensure all filler and caulk are completely dry. Apply a high-quality primer evenly over all the boards and battens. Pay attention to covering all surfaces, including the edges and any areas that were filled. Allow the primer to dry completely according to the product instructions.

Videos for this step

Apply Primer CoatPrime the PanelingPrime the Wall

Tools and Materials

← Project

How to Install Board and Batten Up a Staircase Wall

Step 7 of 8·4.5 hr left

Clean the Staircase Wall
60 minutes4 items
Mark Layout Lines
90 minutes3 items
Cut Battens to Size
60 minutes4 items
Install Vertical Battens
180 minutes6 items
Cut and Install Horizontal Boards
240 minutes8 items
Fill Nail Holes and Caulk Gaps
120 minutes6 items
7
Prime the Paneling
90 minutes4 items
8
Paint the Paneling
180 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.