Step 4 · Install Vertical Battens

Apply a bead of construction adhesive to the back of each batten. Position the batten along its marked layout line on the wall. Secure the batten by driving finishing nails through it into the wall studs (if accessible) or using a brad nailer. Ensure the nails are countersunk slightly below the surface.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Vertical Battens

Apply a bead of construction adhesive to the back of each batten. Position the batten along its marked layout line on the wall. Secure the batten by driving finishing nails through it into the wall studs (if accessible) or using a brad nailer. Ensure the nails are countersunk slightly below the surface.

Videos for this step

Attach Vertical BattensInstall Vertical BattensInstall Vertical Battens

Tools and Materials

← Project

How to Install Board and Batten Up a Staircase Wall

Step 4 of 8·13.5 hr left

Clean the Staircase Wall
60 minutes4 items
Mark Layout Lines
90 minutes3 items
Cut Battens to Size
60 minutes4 items
4
Install Vertical Battens
180 minutes6 items
5
Cut and Install Horizontal Boards
240 minutes8 items
6
Fill Nail Holes and Caulk Gaps
120 minutes6 items
7
Prime the Paneling
90 minutes4 items
8
Paint the Paneling
180 minutes4 items