Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 3 · Mark Mounting Holes

Hold the grab bar against the wall at the determined location, ensuring it is level. Align the mounting flanges with the marked stud centerlines or blocking. Use a pencil to mark the exact center of each screw hole on the wall through the grab bar's mounting holes. Double-check that the grab bar is perfectly level before marking all holes.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Mark Mounting Holes

Hold the grab bar against the wall at the determined location, ensuring it is level. Align the mounting flanges with the marked stud centerlines or blocking. Use a pencil to mark the exact center of each screw hole on the wall through the grab bar's mounting holes. Double-check that the grab bar is perfectly level before marking all holes.

Videos for this step

Mark Mounting Hole LocationsMark Second Mounting PointPrepare Grab Bar and Mark Drill Points

Tools and Materials

← Project

How to Install a Grab Bar at the Top or Bottom of Stairs

Step 3 of 6·1 hr left

Determine Grab Bar Location
15 minutes3 items
Verify Wall Structure
20 minutes4 items
3
Mark Mounting Holes
10 minutes3 items
4
Drill Pilot Holes
15 minutes3 items
5
Mount the Grab Bar
25 minutes4 items
6
Test Stability
10 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.