After all joints are completed and have cooled, it's time to test your work. Ensure all faucets that were opened are now closed. Go to the main water shutoff valve and turn it on very slowly, allowing the pipes to fill with water gradually. A sudden rush of water can cause a 'water hammer' effect. Once the system is pressurized, carefully inspect the new joint(s) for any signs of dripping or moisture. Run your finger around the seam to check for even the smallest leaks. If the joint is dry, your work is complete.

Step 9 of 9

2 min