Skip to main content

Step 9 · Install New Tile

After the waterproofing membrane has fully cured (check manufacturer's instructions), mix a small batch of thin-set mortar to a peanut butter-like consistency. Apply the mortar to the backer board patch using the flat side of a notched trowel, then comb it with the notched side to create even ridges. Firmly press your replacement tile(s) into the mortar with a slight twisting motion. Use tile spacers to maintain consistent grout lines that match the rest of the wall. Allow the mortar to cure for at least 24 hours before proceeding.

Install New Tile - How to Replace a Shower Valve Through a Tiled Wall - Stesso