Carefully lower the new pump into the center of the clean pit, ensuring its base is stable and level. Check that the float switch can move up and down freely without hitting the sides of the pit. Now, dry-fit the new plumbing. This includes a short piece of PVC pipe from the pump's adapter up to the new check valve, and another piece from the check valve up to a coupling connecting to the existing pipe you cut earlier. The arrow on the check valve MUST point away from the pump. Once you confirm the fit, disassemble the pieces. Apply purple PVC primer to the outside of the pipe ends and the inside of the fitting sockets. Then, apply a layer of PVC cement over the primer on both surfaces, push the pipe into the fitting with a quarter-turn twist, and hold firmly for 30 seconds to allow the solvent weld to set.
Step 6/7
Install New Pump and Reconnect Piping2 min