With the installation complete, it's time to test your work. First, ensure all the faucets you opened to drain the system are now closed. Go back to the main water shutoff valve. Turn the handle counter-clockwise VERY SLOWLY. You should hear the pipes filling with water. Opening the valve slowly prevents a sudden pressure surge that could damage your plumbing. Once the valve is fully open, return to your work area. Carefully inspect the new fittings on all sides for any signs of dripping or moisture. Use a dry paper towel to wipe the connections and see if any wetness appears, which would indicate a very slow leak.
Step 6/7
Restore Water and Check for Leaks2 min