Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 7 · Install Drawer Slides in Staircase Opening

Measure and mark the positions for the outer members of the drawer slides on the interior walls of the staircase opening. These marks must be perfectly parallel to each other and level. Use a level and measuring tape to ensure accuracy. Pre-drill pilot holes into the studs or framing members and securely fasten the outer slide members using appropriate screws. Ensure the spacing between the slides matches the dimensions of the drawer boxes.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Install Drawer Slides in Staircase Opening

Measure and mark the positions for the outer members of the drawer slides on the interior walls of the staircase opening. These marks must be perfectly parallel to each other and level. Use a level and measuring tape to ensure accuracy. Pre-drill pilot holes into the studs or framing members and securely fasten the outer slide members using appropriate screws. Ensure the spacing between the slides matches the dimensions of the drawer boxes.

Videos for this step

Install Drawer Slides to StructureInstalling Cabinet-Side Drawer SlidesInstall Drawer Slides

Tools and Materials

← Project

How to Build Pull-Out Drawers Under Stairs

Step 7 of 10·5.8 hr left

Measure and Plan Staircase Opening
60 minutes4 items
Design Drawer Dimensions and Slide Mechanism
120 minutes5 items
Select and Purchase Materials
90 minutes5 items
Cut Drawer Box Components
180 minutes5 items
Assemble Drawer Boxes
150 minutes5 items
Install Drawer Slides on Drawer Boxes
90 minutes5 items
7
Install Drawer Slides in Staircase Opening
120 minutes7 items
8
Install Drawer Fronts (Optional)
60 minutes5 items
9
Insert Drawers and Test Operation
45 minutes2 items
10
Finishing Touches and Optional Additions
120 minutes6 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.