Step 10 · Finishing Touches and Optional Additions

If the drawer fronts or boxes are unfinished, apply paint, stain, or a protective sealant according to the manufacturer's instructions. Allow adequate drying time between coats. Once the finish is dry, you can install drawer handles or knobs if desired. Ensure they are centered and securely attached. Clean up any dust or debris from the work area.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Finishing Touches and Optional Additions

If the drawer fronts or boxes are unfinished, apply paint, stain, or a protective sealant according to the manufacturer's instructions. Allow adequate drying time between coats. Once the finish is dry, you can install drawer handles or knobs if desired. Ensure they are centered and securely attached. Clean up any dust or debris from the work area.

Videos for this step

Install Inset Drawer Fronts and HardwareApply Finish and Install Drawer Fronts and HandlesApply Finish and Install Drawer Fronts and Handles

Tools and Materials

← Project

How to Build Pull-Out Drawers Under Stairs

Step 10 of 10·2 hr left

Measure and Plan Staircase Opening
60 minutes4 items
Design Drawer Dimensions and Slide Mechanism
120 minutes5 items
Select and Purchase Materials
90 minutes5 items
Cut Drawer Box Components
180 minutes5 items
Assemble Drawer Boxes
150 minutes5 items
Install Drawer Slides on Drawer Boxes
90 minutes5 items
Install Drawer Slides in Staircase Opening
120 minutes7 items
Install Drawer Fronts (Optional)
60 minutes5 items
Insert Drawers and Test Operation
45 minutes2 items
10
Finishing Touches and Optional Additions
120 minutes6 items