Skip to main content

Project Completion

11:29
21:27
11.6K views

At 11:29 in

Zoning Board Battle: My fight to build a deck!

What happens here

With the railings fully installed, the project is considered complete. This final step involves a thorough inspection of the entire structure to ensure all components are securely fastened, stable, and meet any applicable safety guidelines (even if technically circumventing some zoning laws). Any loose debris, wood scraps, or tools are gathered and the immediate work area is cleaned up. Although not explicitly shown, applying a weather-resistant sealant or stain is a recommended final touch for longevity and aesthetic appeal.

Goal: The final inspection and cleanup of the newly constructed ground-level deer stand/deck, ensuring all safety measures are met and the area is tidy.

Tools and materials

  • Broom
  • Work Gloves
  • Weather-resistant Sealant/Stain

What they say

Hide

whatever way benefits them the most and this ground level deck is one of those example I'm interpreting this as a ground level deck that I could put a set of skids on and move out if I needed to do I want to flip no but I'm protecting myself and if you guys want to do any projects just know that it might be smart for you guys to take the extra precautions to do whatever you need to

Auto-generated from the video audio.