Project Resource and Time Estimation
19:50
20:39
64.3K views
At 19:50 in
Wrecked his truck & Flipped his 4 wheeler in a wide open field?!?
What happens here
The speaker estimates the project will require three workers for two weeks, totaling 240 labor hours. Additionally, he anticipates three dump truck loads of concrete debris will need to be removed. The labor hours and concrete debris are critical estimates.
Goal: Provide a realistic assessment of the time, manpower, and waste removal needs.
Tools and materials
- Workers N/A — Performing manual labor and operating equipment
- Dump truck loads of concrete debris N/A — Quantifying the amount of concrete debris to be removed