Vault Repair and Weatherproofing
At 7:04 in
Working on an underground Vault lid at a Commercial Excavation site
What happens here
Once the lids are removed, workers are seen inside the underground vault. Brad explains that the previous valves, installed in 1984, were inoperable and needed to be replaced with more current valves. Before the new lids are placed, a worker applies 'ram neck' butyl rubber weather stripping around the perimeter of the vault opening. This material is designed to create a weather-tight seal when the heavy concrete lids are set back in place. The application of insulation and a corrosion-resistant product to the discharge pipes is also mentioned.
Goal: Repair and replace internal utility components and ensure the vault is properly sealed and protected.
Tools and materials
- Discharge Pipes — Part of the utility system within the vault
- Insulation — Protecting pipes from heat loss and corrosion
- Valves — Controlling the flow in the steam and hot water lines
- Butyl Rubber Weather Stripping — Creating a weather-tight seal for the concrete lids
- Corrosion-Resistant Product — Protecting discharge pipes from corrosion