Skip to main content

Removing Heavy Concrete Vault Lids

1:50
15:20
87.3K views

At 1:50 in

Working on an underground Vault lid at a Commercial Excavation site

What happens here

At the job site, workers are setting up an excavator and a grapple truck (Nova-Frost, Inc.) to remove heavy concrete vault lids. Brad, the on-site foreman, explains that they are lifting the concrete lids to access underground utility lines. He details how special picks are used, drilled into the concrete with a 3/4-inch bit, and then epoxied in place. The lids themselves weigh between 9,000 and 12,000 pounds. These heavy lids serve as the 'roof' of the underground vault, covering return and supply steam lines and hot water pipes that require repair or replacement.

Goal: Safely remove massive concrete vault lids using heavy machinery and specialized lifting gear.

Tools and materials

  • 3/4-inch Drill Bit — Creating anchor points in the concrete for lifting picks
  • Concrete Vault Lids — Covering the underground utility vault
  • Cordless Drill — Drilling holes for the lifting picks
  • Excavator Link-Belt 235X3 — Lifting and moving heavy concrete lids
  • Grapple Truck Nova-Frost — Assisting with material handling and potentially removing debris
  • Heavy Chains — Connecting the concrete lids to the excavator bucket for lifting
  • Lifting Shackles/Picks — Anchoring the chains to the concrete lids
  • Epoxy — Securing the lifting picks into the concrete

What they say

Hide

there now i got a normal hard hat [Applause] so this is a district energy job and life with nova frost does all of their work for them rubber tracks just say hi to brad he runs everything how are you doing buddy good to meet you nice to see ya so what do you got what do you got going on with this job we're going to take these tops get them out of here and then we'll start setting these lids on we're going to ram neck them down and set them okay he was saying we only use two of them special picks do you have them in place now so you core drill that into the concrete you drill them in with like a three-quarter inch bit and then you epoxy them in so what's down in the pit there's a return to supply steam line hot water pipe in between [Music] all right something else i want to show you guys you see this cut right here you see the ledge step up ledge step up that's how you make the cut so before the vault lid goes back on you put the weather stripping around the outside yeah it's a ram neck that's what it is so it's a butyl rubber what they'll do is they'll lay it down one or two layers on the ledges here and then they'll

Auto-generated from the video audio.