Removing Heavy Concrete Vault Lids
At 1:50 in
Working on an underground Vault lid at a Commercial Excavation site
What happens here
At the job site, workers are setting up an excavator and a grapple truck (Nova-Frost, Inc.) to remove heavy concrete vault lids. Brad, the on-site foreman, explains that they are lifting the concrete lids to access underground utility lines. He details how special picks are used, drilled into the concrete with a 3/4-inch bit, and then epoxied in place. The lids themselves weigh between 9,000 and 12,000 pounds. These heavy lids serve as the 'roof' of the underground vault, covering return and supply steam lines and hot water pipes that require repair or replacement.
Goal: Safely remove massive concrete vault lids using heavy machinery and specialized lifting gear.
Tools and materials
- 3/4-inch Drill Bit — Creating anchor points in the concrete for lifting picks
- Concrete Vault Lids — Covering the underground utility vault
- Cordless Drill — Drilling holes for the lifting picks
- Excavator Link-Belt 235X3 — Lifting and moving heavy concrete lids
- Grapple Truck Nova-Frost — Assisting with material handling and potentially removing debris
- Heavy Chains — Connecting the concrete lids to the excavator bucket for lifting
- Lifting Shackles/Picks — Anchoring the chains to the concrete lids
- Epoxy — Securing the lifting picks into the concrete
What they say
(1,135 characters)Hide
What they say
(1,135 characters)Auto-generated from the video audio.