Replacing Lids and Backfilling
At 8:19 in
Working on an underground Vault lid at a Commercial Excavation site
What happens here
After the repairs and weatherproofing are complete, the heavy concrete lids are carefully lowered back into place using the excavator. Workers on the ground guide the lids, ensuring they align correctly with the weather stripping. The lids are precisely positioned to create a secure seal. Brad also discusses the process of backfilling, mentioning that the excavation spoil is hauled back to the shop, and the backfill will consist of 95% standard proctor density clean fill sand, rather than a roller packer due to the green area and vault lid's weight.
Goal: Securely replace the concrete vault lids and prepare the site for backfilling and restoration.
Tools and materials
- Excavator Link-Belt — Lowering the concrete lids
- Heavy Chains — Securing the concrete lids for lowering
- Lifting Shackles/Picks — Connecting chains to the concrete lids
- Plate Compactor — Compacting backfill material (mentioned, but not used for lids directly)
- Clean Fill Sand — Backfilling the excavated area to achieve 95% standard proctor density